Subsea Geo ToolsSubsea Geo Tools

Pioneer CPT300

Build your custom configuration.

Equipment configuratorLive configurationP300-E-0-3-8
BASE & BALLAST ENVELOPE · W × D × H3,000 × 3,000 × ≈ 3,770 mmHeight to hoist frame · cables excluded
⊕FRONT ELEVATION
Selected optional equipment

Subsea CPT cable reel × 1

Listed for quotation; not drawn in this elevation. Mounting geometry and dimensions pending.
Subsea Geo ToolsSubsea Geo Tools
SUBSEA GEO TOOLS / PIONEER CPT300
SUPPLIED POWERPOINT

3D assembly references

Fixed reference renders. Your live selection is shown in the main assembly view.

Pioneer assembled with basic skirt and no ballast packs
Basic skirt · plates · no packs
Illustrates the assembly in 3D
Pioneer extended skirt three 5 tonne plates and four 2 tonne packs
29 mT configuration
Extended · 3 × 5 mT plates · 4 packs
Pioneer extended skirt three 5 tonne plates and eight 2 tonne packs
37 mT configuration
Extended · 3 × 5 mT plates · 8 packs

Request a quotation

Your selected configuration will be addressed to info@subseageotools.com, with your email address in CC.

Configuration included in your request

This opens your email application with the request prepared. Review it and press Send there. Automatic sending is not connected yet.

Download your configuration

Please enter your details to download your configuration PDF.

Your contact details and selected configuration will be sent to Subsea Geo Tools and recorded with this report request. Privacy policy.

Hoist frame SWL exceeded

Your configuration exceeds the 37 t safe working load (SWL) of the hoist frame. A bespoke hoist frame may be required and may not be possible.